Twinflow Contrete Skip 1020
Construction Equipment
The Eichinger 1020 is the ideal concrete skip for the quick pouring of concrete in a high volume where accuracy is not a requirement. Together with the benefit of a fold-away chute which can be used to direct the pour when necessary. Available with either a levered gate mechanism or a choice between a fixed lifting arm and a lifting chainset.
Find our full range of construction machinery and equipment here, or view all Eichinger attachments here. Get in contact with Mawsley Machinery today for more information.